Open BIM Cost Estimator has been created to automatically estimate the execution cost of a construction project during its preliminary phases.
Open BIM Cost Estimator is integrated in the Open BIM workflow via the BIMserver.center platform.
Open BIM Cost Estimator has several ways to display the values of the evaluated magnitudes, so users can analyse the results in the most efficient way according to their needs.
The cost determined by the program corresponds to the execution cost of the project, which includes the total amount of direct and indirect costs that are incurred for its execution, where:
The general expenses and the industrial benefit of the contractor that correspond to the contract budget or tender budget are excluded from the execution cost of the project, as well as taxes, licenses, technical fees and other expenses that are attributable to the developer are also excluded.
It is defined as the result of dividing the total amount of the "Project execution budget" by the "Total built surface area (S)", expressed in square metres.
"Total built surface area (S)" is the area delimited by the perimeter lines of the external enclosures and, where applicable, the axes of the dividing walls. The program computes 100% of its floor area, overhanging elements, terraces and balconies covered by a roof when they are closed laterally by walls, otherwise, only 50% of its surface is computed.
The comparison of the total amount of the execution cost of the project between two buildings, can be established with an index or ratio, which, in the case of the program, is called "Construction cost per m2".
Open BIM Cost Estimator allows users to view the decomposition of the execution cost of the project by chapters for phases II (Draft project) and III (Design project). Furthermore, in phase III, users can view these chapters and their sub-chapters.
For each chapter or subchapter the amount, the cost per m2 and its impact on the execution cost of the projectare indicated.
Open BIM Cost Estimator generates a document justifying each of the preliminary phases of the project that are contemplated by the application. This document includes the project data that has been entered and the results of the calculation of the execution cost for the project.
The report can be printed directly from the application and exported to PDF, DOCX, TXT, HTML and RTF formats.
More information on Open BIM Cost Estimator can be found by clicking on the following links: