Open BIM Cost Estimator has been created to automatically estimate the execution cost of a construction project during its preliminary phases.
Open BIM Cost Estimator is integrated in the Open BIM workflow via the BIMserver.center platform.
The aim of the program is to automatically estimate the execution cost of a construction project during its preliminary phases, in a simple and practical way, using a fast, efficient and precise design model, by taking into account the built surface, height of the building, and typological, construction, geographic and socioeconomic factors.
The specifications of the GSA (General Services Administration) of the USA and AIA (American Institute of Architects), indicate, depending on the phase of the project, the allowable variance in the project cost, as shown in the table below:
Project phase |
Variance (%) according to GSA |
Variance (%) according to AIA |
Preliminary analysis |
10 |
10 - 15 |
Draft project |
7 - 10 |
7,5 - 12,5 |
Design project |
5 - 7,5 |
5 - 10 |
Depending on how defined and developed the project is - preliminary analysis, draft project and design project -, the calculation of the execution cost of the project is more precise, and therefore, its accuracy is increased. In the case of the program, the tolerances of the deviation of the initial cost with respect to the final cost of the project, provided that the initial parameters of the project remain unchanged regarding surfaces, heights or construction properties, are summarized in the following table:
Project phase |
Variance (%) |
Preliminary analysis |
≤ 12 |
Draft project |
≤ 10 |
Design project |
≤ 7 |
More information on Open BIM Cost Estimator can be found by clicking on the following links: